Top Menu
Language Select
W3C Color Changer
Tema: Biru dan Hijau Tema: Merah Tema: Hijau
Font Sizer
Background Changer
Latar Belakang: 1 Latar Belakang: 2 Latar Belakang: 3 
Banner
Last Updated Date
Kemaskini Pada: 23 Apr 2015
Versi 6.0.9
Footer Menu
Best Viewed
Aplikasi Talikhidmat

LOGO : PEJABAT DAERAH BETONG KE ARAH AMALAN PERSEKITARAN BERKUALITI 5S

PERKHIDMATAN ATAS TALIAN (ORANG AWAM)
LAMAN WEB BERKAITAN

Laman Web Rasmi Ketua Menteri Sarawak

Laman Web Rasmi Setiausaha Kerajaan Negeri Sarawak

Sarawak Electronic Online

WARGA PEJABAT DAERAH BETONG
INFORMASI ORANG AWAM
Tiada Rekod.

MUKA DEPAN

PERUTUSAN
PEGAWAI DAERAH BETONG
FRIDAY BELIK

DO Web.JPG

Selamat datang dan selamat melayari laman web rasmi Pejabat Daerah Betong. Pembangunan laman web rasmi ini adalah bertujuan untuk memberi gambaran dan maklumat mengenai fungsi dan matlamat Pejabat Daerah Betong kepada masyarakat setempat. Disamping itu juga, laman web ini bertujuan untuk menyampaikan dan menyalurkan maklumat-maklumat yang berkaitan secara cepat dan pantas dalam talian.

...

Immediate reconstruction for bridges swept away by floods

Immediate reconstruction for bridges swept away by floods

Borneo Post Posted on March 5, 2015, Thursday

 KUCHING: Eight bridges in Betong swept away during the recent flood will be reconstructed immediately.

Deputy Chief Minister Datuk Patinggi Tan Sri Alfred Jabu Numpang said the federal government has approved allocations to reconstruct bridges at Nanga Tiga, Nanga Linsum, Batu Lintang, Meribong, Rian Batang, Penom, Nanga Jelau and Batu Genting St Mark.

Jabu, who is also Layar assemblyman, said he is in discussions with the Public Works Department (JKR) on the bridge designs, which would raise them by at least six feet from the present level.

“I have made a recommendation to the federal government, which agreed and immediately approved the replacement of all the eight bridges washed away by the recent flood.

“We have discussed with JKR on the design of the bridges, which will be raised by six feet from their present level as a future contingency so that the bridges will not be flooded,” he told reporters during a visit to the Heroes Grave at Jalan Budaya yesterday.

He was inspecting the on-going beautification work at the memorial park, which is expected to be completed by the end of the month.

Jabu said another eight bridges in Baram damaged by flooding would also be reconstructed.

Outboard engines and fibreglass boats, he said, have been sent to flood-hit areas and are expected to be delivered by the end of the week.

On the foundation of Rumah Anji, which was eroded by flood waters, Jabu said the state is working out land clearing details to stabilise the 22-door longhouse at Mupoh Baroh, adding assistance from the army could be a possibility.

“We agree that the work should be done as soon as possible. In the meantime, we have provided allocation for the 22 families,” he said.


Read more: http://www.theborneopost.com/2015/03/05/immediate-reconstruction-for-bridges-swept-away-by-floods/#ixzz3TTAfnBCz

Lawatan YAB PM Datuk Patinggi Mohd.Najib bin Tun Haji Abdul Razak, ke Beladin dan Pusa Bhg.Betong pada 27 Februari, 2015

Upacara Menanam Tiang Pemun di Rmh Baling, Penurin, Betong pada 21.02.2015

Kalendar Aktiviti


Tiada Acara pada masa ini
KAJI SELIDIK
Tiada Undian pada masa ini
PIAGAM PELANGGAN DAN PENCAPAIAN
PERKHIDMATAN AWAM NEGERI SARAWAK

Picture

HUBUNGI KAMI
PENCAPAIAN PEJABAT DAERAH BETONG DALAM PENGURUSAN KUALITI
STATISTIK
online visitor Pelawat Di Talian 1
total visitor Jumlah Pelawat 189,532